Project Overview
Nepal's first commercial wind farm project located in the high-altitude region of Mustang. This pioneering project harnesses the strong Himalayan winds to generate clean electricity.
The project overcomes unique challenges of high-altitude installation and extreme weather conditions while contributing to Nepal's renewable energy goals.
Key Features
High-altitude installation
Cold climate design
Remote monitoring
Modular construction
Grid integration
Technical Specifications
Hub Height
80 meters
Rotor Diameter
90 meters
Turbine Capacity
2 MW each
Wind Speed Range
3-25 m/s
Annual Generation
55 GWh
Number of Turbines
10
Project Status
Progress
47%
Start Date
Jun 2025
Status
Planning
Quick Information
Type
wind
Capacity
20.0 MW
Location
Mustang District, Nepal
Investment
4.5B NPR
Client
Independent Power Producer
Interested in Similar Projects?
Contact our team to discuss your renewable energy project requirements.
Contact Us